Dunbar Slip Repairs

Sealane Inshore were contracted to Southbay Civil engineering to carryout works at Dunbar Harbour for the RNLI launching slip for the Lifeboat. Where we carried out concrete overlay to the existing slipway. Holes and stainless-steel dowels were installed then stainless-steel mesh was placed on the dowel’s shutters were erected, then concrete pumped using a concrete pump to overlay the existing concrete.