Client– Peel Ports
Location– Birkenhead ferry terminal
Principal Contractor– Farrans construction
Anodes designed and supplied by Metec Group ltd:
Installation of 192 galvanic anodes to 16 x steel tubular fender piles.
Divers installed anodes around the clock causing no disruption to ferry crossings.
Due to severe conditions on site (Tidal flow) anodes were installed just above MLWS and bottom brackets were welded on the following tide.