George Leslie Berwick

 Principal contractor: George Leslie- Berwick harbour install.

Cathodic protection designed and supplied by Metec group ltd.

Installation of 49 Anodes to sheet pile wall

All anodes welded in accordance with AWS D3.6M class A underwater qualification.