Client: Port of Dover
Principal contractor: Volker Stevin Boskalis Westminster
Contractor: Sealane Inshore Ltd
Date: March 19
Removal of 8no x AZ x 8 metre long piles burnt at dock sill level (Removal of Wellington Dock)
Client: Port of Dover
Principal contractor: Volker Stevin Boskalis Westminster
Contractor: Sealane Inshore Ltd
Date: March 19
Removal of 8no x AZ x 8 metre long piles burnt at dock sill level (Removal of Wellington Dock)