Sealane were contracted by Port of Tyne Authority to design, supply and install a cathodic protection system to their Roll on Roll off berth.
The existing cathodic protection System had come to the end of its lifespan and needed an upgrade, working closely with Metec Group ltd based in South Shields Sealane completed the installation of 74No galvanic anodes in November 2021.